Location: West Drayton
Project: EV Charger Installation
Value: in the region of £165K
Installation of a new 400A LV distribution system to support a large 22kW EV system with supporting back office software and dashboard.
Location: Regent’s Park, London
Project: Monkey Valley
Value: in the region of £120K
Design and provide a bespoke electrical installation to suit the demands of marsupials. A unique project that evolved around the original Lord Snowdon Aviary.
Location: Westminster
Project: Fire Safety Improvement Works
Value: in the region of £900k
Installation of 3000m+ of 185mm single core MICC cabling, new distribution equipment and geneal power and lighting installations to water and fuel tank rooms.
Location: London
Project: Major Electrical Infrastructure
Value: £ undisclosed
Major Electrical Infrastructure Upgrade Project for Tower Bridge which began in 2022 and is ongoing.
Location: Gatwick & Heathrow
Project: Hangar Lighting Replacements
Value: in the region of £300K
Replacement of high level lighting throughout the hangars.
Location: Hatfield
Project: EV Charger Installation
Value: in the region of £110k
EV Charger Installation at grocery company Ocado’s Hatfield Headquarters
Location: Wokingham
Project: DB Replacements
Value: in the region of £169k
Replace 47 DB’s for National Grid in Wokingham
Location: Edinburgh
Project: Electrical Separation
Value: in the region of £60K
Replacement of UPS systems and associated mains distribution modifications.
Location: London
Project: LED Lighting
Value: in the region of £55K
LED lamp installation replacing 350 Halogen lamps and drivers.
Location: Docklands, London
Project: Lower Ground Event Space Refurbishment
Value: in the region of £45K
CATB fit out for the event space cover all electrics, fire, data and security services
Location: Purfleet, Essex
Project: LED Lighting Replacement
Value: in the region of £40K
LED lighting replacement of 400 Fittings at the warehouse holding area in Purfleet.
Location: Welwyn Garden City
Project: Nano Grid
Value: in the region of £40K
The installation of the electrical infrastructure to support the Nano prototype at Ocado Technologies
Location: London
Project: Power & Data Modifications
Value: in the region of £36K
CATB office fit out with electrical modifications to suit the new Client layout.
Location: Hatfield
Project: Crane Aisle Lighting
Value: in the region of £35k
Installation of LED lighting throughout the ASRS crane aisle
Location: London
Project: Quell Expansion
Value: in the region of £30K
CATB office fit out with electrical modifications to suit the new desk layout.
Location: Dartford
Project: Main LV Panel Replacement
Value: in the region of £30K
Replacement 18way Schneider LV power pact panel
Location: Borehamwood
Project: Arsenal Ladies FC – Floodlight Back Up Generator
Value: in the region of £25K
Generator hook up installation to support the Arsenal ladies team UEFA requirements. Upgrades provided to the floodlights electrical wiring.
Location: London
Project: The Killers Concert
Value: in the region of £25K
Installation of power to support The Killers concert. This included power for the pitch side food/drink stalls and catering equipment required.
Location: London
Project: Box Refurbishments – ongoing
Value: various
Electrical works in conjunction with the refurbishment of various boxes.
Location: Welwyn Garden City
Project: Fab Lab
Value: in the region of £20K
CATB office fit out with electrical modifications to suit the new desk layout.
Location: Welwyn Garden City
Project: Multi Room Enclosure – Submain & Distribution Board Installation
Value: in the region of £20K
The installation of the electrical infrastructure to support the multi room enclosure at Ocado Technologies
Location: London
Project: E-Scooter / E-Bike Charging Zone
Value: in the region of £10K
Installation of power to support the E-bikes in the newly refurbished bike store.
Location: London
Project: Main LV Distribution Upgrades
Value: in the region of £100K
Upgrades to the main electrical distribution and migration of sub mains to new MCCB Switchgear within several buildings across the site.
Location: Heathrow Airport
Project: Installation of New Forklift Charger Station
Value: in the region of £20K
Design and installation of a new forklift charger station with battery extract system.
Location: London
Project: Feature Lighting Upgrades
Value: in the region of £65K
Installation of LED lamp post luminaires across the boulevard and Spanish steps of the Wembley Park Estate.
Location: London & Bristol
Project: Office Lighting Replacement
Value: in the region of £356K
Deinstallation and a full upgrade 2000+ LED luminaires across Motability’s London & Bristol HQ’s
Location: London
Project: Comms Rooms Dual Supplies
Value: in the region of £90K
Supply and installation of new MCCB switch boards / distribution boards and sub mains and associated sub circuits.